Hydran* M2-X Instruction Manual
4.3.10.
Analog Output Cable (If Used)
5
1. Run the cable through a conduit
2. Verify all wires are identified at both ends
3. Connect the wires to the corresponding I/O terminal block
4. Connect the other end of the cable to the SCADA system
4.3.10.
AC Power Supply Cable
6
1. Run the cable through a conduit
2. Remove the plastic cover from the ac power supply terminal block
3. Connect the wires to the ac power supply terminal block
4. Connect the other end of the cable to the power source
4.3.11
Verifying the Hydran M2-X Operation
1. Fasten the cover with the four screws
2. Verify all cable entry points to ensure they are watertight
3. Verify the heating plate is warm
4.4
Configuring the Hydran M2-X
4.4.1
Setting the Date and Time
1. Set Current Date
2. Set Current Time
4.4.2
Setting the Parameters of the History Files
1. Set Short Term Rate to _________ minutes
2. Set Long Term #1 to _________
3. Set Long Term #2 to _________
4. Set Long Term #3 to _________
5. Set Long Term #4 to _________
6. Erase the content of Short Term history file
7. Erase the content of Long Term history file
4.4.3
Setting the Alarm Parameters
1. Wait 30 minutes or until levels are stable
MA-029
Rev. 1.0, 30-Jul-18