Siemens SIDOOR AT40 System Manual page 129

Automatic door control
Hide thumbs Also See for SIDOOR AT40:
Table of Contents

Advertisement

Connecting and commissioning
8.1 Overview of safety and commissioning
Notes on maintenance
The SIDOOR system should be included in the maintenance schedule for the system as a
whole, and inspected in the course of the maintenance intervals stated in the schedule.
An inspection should cover the following points:
● Visual inspection of the control device for contamination and damage
● Visual inspection of the motor for dirt and damage
● Visual and mechanical inspection of the mechanical system, in as far as it is part of the
SIDOOR elevator system. This includes checking the following components:
● Attachment of the motor holder, deflector pulley and mounting bracket
● Wear on the toothed belt
● Check and remeasure the parameters for the safety-relevant force and energy settings
set during commissioning.
Overview of commissioning a door drive
We recommend the following initial commissioning procedure for a door drive:
Table 8- 1
Step
1
2
5
6
7
8
128
Procedure for commissioning a door drive
Procedure
Preparing the control device
Connecting a geared motor to the control
device
Connecting the power supply to the network
and executing a learn run
Connecting digital input signals
Commissioning the control device on the
CAN bus (optional, only for control devices
with corresponding module)
Final settings and checks
Reference
Preparing the control device (Page 129)
section
Connecting a geared motor to the control
device (Page 129) section
Connecting the power supply to the network
and executing a learn run (Page 130) section
Digital input signals (Page 131) section
Final settings and checks (Page 132) section
Door control units SIDOOR AT40 and ATD400V for elevators
System Manual, 06/2018, A5E42192709-AC

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sidoor atd400v

Table of Contents