Parts Replacement and Cleaning Procedure > Major Units > How to assemble the Process Tray Upper Unit (Front/Rear) and the Finisher Lower Feed Guide Unit > Procedure (How to install the Process Tray Upper Unit (Front)
● [B] Adjusting the Position of the Sub Paddle (Front) and the Finisher
Lower Feed Guide Unit
6) While holding the [A] part of the Finisher Lower Feed Guide Unit [1], tighten the 2 screws [2].
CAUTION:
Be sure to keep the [B] part of the Finisher Lower Feed Guide Unit [1] from coming in
contact with the shaft [3].
[B]
[3]
4
Parts Replacement and Cleaning Procedure > Major Units > How to assemble the Process Tray Upper Unit (Front/Rear) and the Finisher Lower Feed Guide Unit > Procedure (How to install the Process Tray Upper Unit (Front)
[1]
7) Rotate the shaft [1] of the Sub Paddle Unit, and check that the 2 ends [3] of the paddle
each fit in the area [A] between the tops of ribs and the bottom of the groove of the Process
Tray Upper Unit (Front) [2].
If they are not lower into grooves with the rib, perform steps 1) to 5) again.