15. Install the bayonet board.
16. Install the air baffle.
17. Install the server into the chassis.
18. Power up the server.
Installing the FlexibleLOM
Procedure
1.
Back up all server data.
2.
Power down the server.
3.
Remove the server from the chassis.
4.
Remove the air baffle.
5.
Remove the bayonet board.
6.
Do one of the following:
•
Remove the secondary PCI riser blank.
•
Remove the secondary PCI riser cage.
7.
Remove the blank.
Installing the FlexibleLOM
49