Procedure
1. Install the air baffle.
2. Install the server into the chassis.
3. Power up the server.
Removing the bayonet board
Procedure
1. Back up all server data.
2. Power down the server.
3. Remove the server from the chassis.
4. Remove the air baffle.
5. Remove the bayonet board.
a. Remove the top three screws from the cover.
b. Remove the bottom three screws from the cover and lift the cover up.
24
Removing the bayonet board