Installation/Dismounting On Din Rail; Input/Output Modules - JUMO mTRON T Operating Manual

Measuring, control, and automation system analog input module 4-channel
Hide thumbs Also See for mTRON T:
Table of Contents

Advertisement

3 Installation
Minimum distances
3.2

Installation/dismounting on DIN rail

All modules in the system are intended for installation on a DIN rail according to DIN EN 60715
(35 mm × 7.5 mm × 1 mm).
The following must always be installed on the left, at the start of the DIN rail:
A central processing unit or
A router module
These modules connect the input/output modules to the voltage supply and the system bus.
NOTE!
To determine the required minimum width of the DIN rail, the widths of the individual modules
are to be added (see technical data of the modules in the respective data sheet or the
module-specific installation instructions).
The widths of the cover (17.5 mm) and both end brackets (each 9.5 mm) should also be
taken into consideration: 17.5 mm + 2 × 9.5 mm = 36.5 mm.
3.2.1

Input/output modules

In a sequence at the user's discretion, input/output modules can be arranged to the right next
to a base unit or a router module.
18
130

Advertisement

Table of Contents
loading

Table of Contents