Installation; Planning The Job - Pacific Power Source MS SERIES Operation Manual

Table of Contents

Advertisement

SECTION 3
3.0

INSTALLATION

THE PROPER INSTALLATION OF AN MS-SERIES AC POWER SOURCE REQUIRES
A THOROUGH UNDERSTANDING OF THE INFORMATION PRESENTED IN THIS
IF THIS EQUIPMENT IS NOT INSTALLED AND USED IN A MANNER SPECIFIED BY
THE MANUFACTURER, THE PROTECTION PROVIDED BY THE EQUIPMENT MAY
Should any question arise regarding the installation of this equipment, the user is
encouraged to call Pacific Power Source, toll free in the USA at 1-800-854-2433 or 949-
251-1800 internationally.
Installation of an MS Power Source consists of the following steps:
1. Planning the job. (Refer to paragraph 3.1)
2. Uncrating and Moving the system. (Refer to paragraph 3.2)
3. Changing Input Voltage, if required. (Refer to paragraph 3.3)
4. Setting the cabinet into place. (Refer to paragraph 3.4)
5. Making Input Connections. (Refer to paragraph 3.6)
6. Making Output Connections. (Refer to paragraph 3.7)
7. Multiple Cabinet Paralleled Systems. (Refer to paragraph 3.8)
8. Inspecting the Installation. (Refer to paragraph 3.9)
3.1

PLANNING THE JOB

The main objective in planning the job is to determine the hardware required to
install the MS-Series Power Source. Proper consideration of the items below will
allow the installation to proceed in an orderly manner.
The first step in planning the job is to determine the size of power source
required to service the load. In normal situations the load should not exceed
80% of the power source's full load ratings. This margin allows the user to add
future loads to the Power Source without sacrificing surge and overload
capabilities.