Procedure And Settings Up To The Point Of Operation; Procedure Up To The Point Of Operation - Mitsubishi Electric SW0DNC-MNETH-B User Manual

Melsecnet/hnetwork interface board
Table of Contents

Advertisement

6 PROCEDURE AND SETTINGS UP TO THE POINT OF OPERATION

6 PROCEDURE AND SETTINGS UP TO THE POINT OF OPERATION
This section explains the operating procedure up to the point the MELSECNET/H
board is operated.

6.1 Procedure Up to the Point of Operation

An outline of the procedure up to the point of MELSECNET/H board operation is
explained below.
Check
Install the software package on a personal computer.
Install the board to a slot on the personal computer.
For the board with external power supply function, wire the
external power supply cable.
Set the channel No. and confirm it with the utility.
Test the hardware of the installed board.
Wire the network cables for the installed board.
Set the parameters and confirm them with the utility.
Test the cable connection and data link on the network.
Execute a user program or utility.
6 - 1
Start
Install the software package
Install the board
Set the channel No.
Check the board
Wire the cables
Set the parameters
Check the network
Execute a user program
Operation
REMARK
It is necessary to perform settings on the control station side in order to use the
MELSECNET/H board as a normal station. Set the control station side as required.
Refer to manuals listed below for the setting on the control station side.
• Q Corresponding MELSECNET/H Network System Reference Manual (PLC to
PLC network)
• For QnA/Q4AR MELSECNET/10 Network System Reference Manual
MELSEC
• • • Section 8.2 Installation
• • • Section 6.3.3 Board installation
• • • Section 6.4.4 External power
supply cable wiring
• • • Section 6.3.4 Channel No. settings
• • • Section 6.5 Test
• • • Section 6.4 Wiring
• • • Chapter 7 PARAMETER SETTINGS
• • • Section 6.5 Test
6
6 - 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents