Rotax 912 i Series Installation Manual page 54

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

NOTE:
See
Connections
Power supply wires (1) from the internal generator (exciting from the left
side (cylinders 2/4) of the ignition housing) to the regulators on FUSE
BOX.
DEUTSCH connector:
- black for generator A/regulator A
- grey for generator B/regulator B
Connections
Graphic
Fig. 5
Effectivity: 912 i Series
Edition 1/Rev. 2
BRP-Powertrain
INSTALLATION MANUAL
The measurement is taken at an oil temperature of 135 °C
(275 °F).
Fig. 5.
Part
1
Stator
2
DEUTSCH connector
3
FUSE BOX with rectifier regulator
Function
24-00-00
January 01/2014
Page 12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents