Continuity Measurement - JLG 1930ES Service Maintenance Manual

Table of Contents

Advertisement

Continuity Measurement

Figure 7-3. Continuity Measurement
• Some meters require a separate button press to
enable audible continuity testing
• Circuit power must be turned OFF before testing con-
tinuity
• Disconnect component from circuit before testing
• Use firm contact with meter leads
• First test meter and leads by touching leads together.
Meter should produce an audible alarm, indicating
continuity
3121166
SECTION 7 - GENERAL ELECTRICAL INFORMATION & SCHEMATICS
Current Measurement
– JLG Lift –
Figure 7-4. Current Measurement (DC)
• Set up the meter for the expected current range
• Be sure to connect the meter leads to the correct
jacks for the current range you have selected
• If meter is not auto ranging, set it to the correct range
(See multi meter's operation manual)
• Use firm contact with meter leads
7-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2030es2630es3246es2646es2039es

Table of Contents