Main Gearbox Assembly - JLG 1930ES Service Maintenance Manual

Table of Contents

Advertisement

Main Gearbox Assembly

1. Spindle Sub-Assembly
2. Spiral Snap Ring
3. Input ring Gear
4. Input Sun Gear
1. Inspect seal surface of spindle. Remove any debris
that may be present.
2. Apply a coating of grease to the lip seal of the hub
sub-assembly.
3. Place Spindle Sub-Assembly on table with carrier
side up.
4. Carefully install the hub sub-assembly (seal side
down) onto the spindle. This installation should be a
slip fit and takes place in 3 stages.
a. Stage 1: The hub slides together until the gear
teeth of the hub hit the gear teeth of the 3 output
planets.
3121166
5. Cover O-Ring
6. Cover Thrust Washer
7. Cover
8. Cover Snap Ring
Figure 3-17. Main Gearbox Disassembly
– JLG Lift –
SECTION 3 - CHASSIS & SCISSOR ARMS
9. Pipe Plug
10. Input Carrier Sub-Assembly
11. Hub Sub-Assembly
b. Stage 2: Find the planet gear that is tight and
turn it until you feel it go into mesh with the hub
gear teeth, apply slight downward pressure to
the hub and then find the next gear that is tight
and do the same.
c. Stage 3: Once all the planet gears are in mesh
apply pressure to the hub, it should go on the
rest of the way.
5. Install retaining ring into the groove on the OD of the
spindle carrier. This is a spiral retaining ring so it will
not require pliers. You will need to pull the retaining
ring apart and work it into the groove.
3-19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2030es2630es3246es2646es2039es

Table of Contents