SECTION 3 - CHASSIS & SCISSOR ARMS

3.8 POWER MODULE - SEVCON

P
M 2
M 1
MACHINE FRONT
The Sevcon Power Module, P/N-1600346 was replaced by
the ZAPI Power Module (See Figure 3-33.) on macines
built starting in mid year 2010.
Table 3-1. Sevcon Power Module Specs
Operating Voltage (Pin 1 and B+)
Maximum Current Limits:
Armature
Field
Pump
Standby Current
Temperature Range:
Operating
Storage
Thermal Limit
Switching Frequency
The Power Module is located at the front of the machine
as shown in Figure 3-32., Sevcon Power Module Location.
3-38
F 1
B +
B -
F 2
Figure 3-32. Sevcon Power Module Location
14.5 to 40 VDC
350 A
40 A
150 A
150 mA
-30°C to 40°C
-40°C to 70°C
75°C to 90°C
16 kHz
SEVCON POWER MODULE
Use the following instructions when replacing the Power
Module.
1. Make sure power to the machine is turned off and
the batteries are disconnected.
NOTE: Note the wire terminal locations when removing the
old Power Module.
2. Disconnect all wires from the old Power Module and
remove from the machine.
3. Before bolting the Power Module on, using a V-notch
trowel, apply a layer of heat transfer grease to the
back of the new Power Module.
4. Be sure that the terminals are oriented as shown.
5. After installing the new Power Module, begin con-
necting the wires back to the controller.
6. Torque the M6 terminal bolts to 5 ft-lb. (7 Nm).
Torque the M8 terminal bolts to 7 ft-lb. (10Nm).
7. After all connections to the Power Module are made,
the battery can be reconnected.