Motor Assembly - JLG 1930ES Service Maintenance Manual

Table of Contents

Advertisement

Motor Assembly

NOTE: Applies only to:
USA machines built S/N 0200152825 to S/N
020170585,
Belgium machines built S/N 1200008481 to S/N
1200015159.
1. Insert motor into back of gearbox. Motor will pilot on
the four bosses in the gearbox. Try to keep the end
of the motor shaft from causing damage to the lip
seal in the gearbox.
NOTE: The motor may need to be rotated to line up the sun
gear splines with the motor shaft splines.
3121166
1. Motor
2. Cable
Figure 3-19. Motor Assembly
– JLG Lift –
SECTION 3 - CHASSIS & SCISSOR ARMS
3. Bolt
4. Washer
2. Install the two motor mounting bolts. Torque to 9 - 11
ft-lbs (12 - 15 Nm).
3. Connect the end of the cable to the power control
module.
4. Fill the gearbox with oil ISO grade 68 oil or oil of a
similar viscosity (80W gear oil or 20W engine oil).
The gearbox will need to be filled with 10 oz of oil.
3-23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2030es2630es3246es2646es2039es

Table of Contents