How to install pellet feeder and container

Install pellet container and pellet feeder. There should be min. height difference of 400 mm between
opening of feeder and burner inlet pipe. In horizontal direction, opening of feeder and inlet pipe
should be in min. distance of 150 mm (i.e. not vertically aligned).
Fill container with pellets and connect feeder into power socket (230 V~). Let feeder run, unless it
achieves continual pellet supply. It is recommended to fasten plastic bag to the opening of feeder to
catch the falling pellets. Disconnect feeder from socket. Install inlet hose between feeder opening
and inlet pipe and set length of hose. Hose should not be straight, but not too bent – otherwise,
pellets would accumulate and stuck in it. Connect feeder into socket on the rear boiler side.
Burner start
Burner is automatically turned into standby mode by switching the main boiler switch.
Burner is started by turning the burner mode switch on and by turning the boiler thermostat into
position adequate to the required boiler temperature. According to the requirement for heat supply,
is the burner started and combusts pellets, until thermostat gives instruction for stop.
Burner is alternatively controlled by boiler thermal probe, connected to the TS1 connection on the
right upper side of circuit board. Make sure, that connection is tightly fixed.
Burner shut down
Burner is turned off by the stop signal from operating thermostat, by turning the burner switch off
(standby mode) or by the burn-down activated through menu.