Verifying Package Contents - Cisco Catalyst 3750 Hardware Installation Manual

Hide thumbs Also See for Catalyst 3750:
Table of Contents

Advertisement

Chapter 3
Switch Installation

Verifying Package Contents

Note
78-15136-03
Cabling is away from sources of electrical noise, such as radios, power lines,
and fluorescent lighting fixtures. Make sure the cabling is safely away from
other devices that might damage the cables.
Airflow around the switch and through the vents is unrestricted.
Temperature around the unit does not exceed 113°F (45°C).
If the switch is installed in a closed or multirack assembly, the
Note
temperature around it might be greater than normal room temperature.
Carefully remove the contents from the shipping container, and check each item
for damage. If any item is missing or damaged, contact your Cisco representative
or reseller for support. Return all packing material to the shipping container, and
save it.
The switch is shipped with these items:
This Catalyst 3750 Switch Hardware Installation Guide
About the Catalyst 3750 Documentation flyer
AC power cord (AC-powered switches)
One RJ-45-to-DB-9 adapter cable
Mounting kit containing:
Four rubber feet for mounting the switch on a table
Two 19-inch rack-mounting brackets
Four Phillips flat-head screws for attaching the brackets to the switch
(Catalyst 3750G-24TS switch)
Six Phillips flat-head screws for attaching the brackets to the switch
(Catalyst 3750-24TS, 3750G-24T, 3750-48TS, 3750-24PS, 3750-48PS,
and 3750G-16TD switches)
Four Phillips machine screws for attaching the brackets to a rack
Catalyst 3750 Switch Hardware Installation Guide
Preparing for Installation
3-9

Advertisement

Table of Contents
loading

Table of Contents