Chapter 3
Switch Installation
Table or Shelf Mounting
Step 1
Step 2
78-15136-03
Run the setup program. See the
•
page
C-11.
Connect to the front-panel ports. See the
•
10/100/1000 Ports" section on page
Module" section on page
section on page 3-59
To use the CLI, enter commands at the Switch> prompt through the console port
by using a terminal program or through the network by using Telnet. For
configuration information, refer to the switch software configuration guide or the
switch command reference.
Follow these steps to install the switch on a table or shelf:
Locate the adhesive strip with the rubber feet in the mounting-kit envelope. Attach
the four rubber feet to the recessed areas on the bottom of the unit.
Place the switch on the table or shelf near an AC power source.
After the switch is mounted on the table, you might need to perform these tasks
to complete the installation, run the setup program, and access the switch:
(Optional) Connect the switches in the stacks. See the
•
StackWise Cable to StackWise Ports" section on page
Connect to the console port, and start the emulation software. See the
•
"Connecting to the Console Port" section on page C-7
Terminal Emulation Software" section on page
Power on the switch. See the
•
page
C-9. If the switches are stacked, see the
section on page
3-15.
"Completing the Setup Program" section on
"Connecting to the 10/100 and
3-51, the
3-55, and the
"Connecting to a XENPAK Module"
to complete the installation.
"Connecting to a Power Source" section on
Catalyst 3750 Switch Hardware Installation Guide
Installing the Switch
"Connecting to an SFP
"Connecting
3-38.
and the
"Starting the
C-9.
"Powering Considerations"
3-37