Verifying Switch Operation - Cisco Catalyst 3750 Hardware Installation Manual

Hide thumbs Also See for Catalyst 3750:
Table of Contents

Advertisement

Preparing for Installation

Verifying Switch Operation

Connecting a PC or Terminal to the Console Port
Catalyst 3750 Switch Hardware Installation Guide
3-10
One cable guide and one black Phillips machine screw for attaching the
cable guide to one of the mounting brackets
One RPS connector cover (for wall mounting)
Two Phillips pan-head screws (for attaching the RPS cover)
Four Phillips truss-head screws (for wall-mounting brackets)
StackWise cable: 0.5-meter, 1-meter, or 3-meter cable.
If you do not specify the length of the StackWise cable, the 0.5-meter
Note
cable is supplied.
Before installing the switch in a rack, on a wall, or on a table or shelf, you should
power the switch and verify that the switch passes POST. These sections describe
the steps required to connect a PC to the switch console port, and to power on the
switch and observe POST:
Connecting a PC or Terminal to the Console Port, page 3-10
Powering On the Switch and Running POST, page 3-12
To connect a PC to the console port, use the supplied RJ-45-to-DB-9 adapter
cable. To connect the switch console port to a terminal, you need to provide a
RJ-45-to-DB-25 female DTE adapter. You can order a kit (part number
ACS-DSBUASYN=) containing that adapter from Cisco. For console port and
adapter pinout information, see the
page
B-5.
The terminal-emulation software—frequently a PC application such as
Hyperterminal or Procomm Plus—makes communication between the switch and
your PC or terminal possible.
Chapter 3
"Cable and Adapter Specifications" section on
Switch Installation
78-15136-03

Advertisement

Table of Contents
loading

Table of Contents