3
C H A P T E R
78-15136-03
Switch Installation
Preparing for Installation
Warnings
3-2
EMC Regulatory Statements
U.S.A.
3-4
Class A Notice for Taiwan and Other Traditional Chinese Markets
VCCI Class A Notice for Japan
Class A Notice for Korea
Class A Notice for Hungary
Installation Guidelines
Verifying Package Contents
Verifying Switch Operation
Connecting a PC or Terminal to the Console Port
Powering On the Switch and Running POST
Powering Off the Switch and Disconnecting the Console Port
Planning the Stack
Planning Considerations
Powering Considerations
Cabling Considerations
Recommended Cabling Configurations
Installing the Switch
Rack Mounting
Removing Screws from the Switch
Attaching Brackets to the Catalyst 3750G-24TS Switch
Attaching Brackets to the Catalyst 3750-24TS, 3750G-24T, 3750G-12S,
3750-24PS, 3750-48PS, 3750G-16TD, and 3750-48TS Switches
Mounting the Switch in a Rack
Attaching the Cable Guide
3-1
3-2
3-4
3-5
3-5
3-6
3-7
3-9
3-10
3-14
3-14
3-15
3-15
3-19
3-19
3-29
3-31
Catalyst 3750 Switch Hardware Installation Guide
3-10
3-12
3-17
3-20
3-21
Contents
3-4
3-13
3-26
vii