Powering On the Switch

Powering On the Switch
Step 1
Step 2
Catalyst 3750 Switch Hardware Installation Guide
1-4
Complete these steps to power on the switch:
Connect one end of the AC power cord to the power connector on the switch rear
panel, as shown in
Figure
Figure 1-3
Connecting the Power
S TA C K
1
CO NS O
S TA C K
LE
2
2
1
Switch
2
Connect the other end of the power cable to a grounded AC outlet.
As the switch powers on, it begins the power-on self-test (POST), a series of tests
that runs automatically to ensure that the switch functions properly. POST lasts
approximately 1 minute.
1-3.
DC IN
PU TS
FO R RE
PO W ER
MO TE
RA TI NG
SP EC IF
SU PP LY
10 0- 24
IE D IN
0V ~
MA NU
1.2 A- 0>
+1 2v
AL
6A , 50
@ 13 A
-6 0 HZ
AC power cord
Chapter 1
Using Express Setup
1
78-15136-03

Advertisement

Table of Contents
loading

Table of Contents