Cisco Catalyst 3750 Hardware Installation Manual page 96

Hide thumbs Also See for Catalyst 3750:
Table of Contents

Advertisement

Planning the Stack
Side-by-Side Mounting in a Rack or on a Wall
Figure 3-8
Stacking up to Eight Switches in a Side-by-Side Mounting Configuration
Figure 3-9
Stacking Nine Switches in a Side-by-Side Mounting Configuration
Catalyst 3750 Switch Hardware Installation Guide
3-18
Figure 3-7
Stacking the Catalyst 3750 Switches in a Vertical Rack or on a Table
Using 0.5-meter and 3-meter StackWise Cables
Figure 3-8
and
Figure 3-9
the switches are rack- or wall-mounted side-by-side. Use the 1-meter and 3-meter
StackWise cables to connect the switches. These configuration provide redundant
connections.
are examples of recommended configurations where
Chapter 3
Switch Installation
78-15136-03

Advertisement

Table of Contents
loading

Table of Contents