Connecting to a XENPAK Module
Step 4
Step 5
Figure 3-48 Connecting to a XENPAK Module Port
1
SC connector
Step 6
Catalyst 3750 Switch Hardware Installation Guide
3-60
Insert the other cable end into a fiber-optic receptacle on a target device.
Observe the XENPAK module port status LED.
The LED turns green when the switch and the target device have an established
link.
The LED turns amber while the STP discovers the network topology and searches
for loops. This process takes about 30 seconds, and then the port LED turns green.
If the LED is off, the target device might not be turned on, there might be a cable
problem, or there might be problem with the adapter installed in the target device.
See
Chapter 4, "Troubleshooting,"
1
T X
R X
1
If necessary, reconfigure and restart the switch or target device.