Chapter 3
Switch Installation
Figure 3-39 Removing a Bale-Clasp Latch SFP Module by Using a Flat-Blade Screwdriver
1 3
1 4
1 5
1 6
1 7
1 8
13 X
1 9
2 0
14 X
1
Bale clasp
Step 5
Step 6

Installing and Removing XENPAK Modules

Note
78-15136-03
2 1
2 2
C a t a ly s t
2 3
2 4
3 7 5 0
23 X
1
24 X
1
Grasp the SFP module between your thumb and index finger, and carefully
remove it from the module slot.
Place the removed SFP module in an antistatic bag or other protective
environment.
These sections describe how to install and remove XENPAK modules. XENPAK
modules are inserted into the XENPAK module slot on the front panel of the
Catalyst 3750G-16TD switch. These field-replaceable transceiver modules
provide 10-Gigabit interfaces.
The 10-Gigabit Ethernet XENPAK modules are referred to as 10-Gigabit Ethernet
module ports in the switch software documentation.
S E R IE S
2
Catalyst 3750 Switch Hardware Installation Guide
Installing and Removing XENPAK Modules
3-45