Coordinate Resection Measurement - Sokkia SRX1 Operator's Manual

Series srx surveying instruments
Table of Contents

Advertisement

16. RESECTION MEASUREMENT
16.1

Coordinate Resection Measurement

N, E, Z of an instrument station is determined by the measurement.
PROCEDURE
1. Select "Resection" in <Menu>.
2. Select "NEZ" to display <Resection/Known
point>.
3. Input the known point.
After setting the coordinates and target height for
for the first known point press [OUT] to move to
the second point.
• Press [READ] to read in coordinate data
registered in Program mode (SDR).
• Press [IN] to return to settings for the previous
point.
When all required known points have been set,
press [OK].
80

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srx2Srx3Srx5

Table of Contents