5.4 SYSTEM SETUP
SETTING
BREAKER 1 FUNCTION
= Enabled
= Disabled
SETTING
BREAKER 1 BLOCK OPEN
Off = 0
D60, L60, and L90 devices only from trip output
FLEXLOGIC OPERANDS
TRIP PHASE A
TRIP PHASE B
TRIP PHASE C
TRIP 3-POLE
SETTING
BREAKER 1 OPEN
Off = 0
61850 Select & Open
USER 3 OFF/ON
To open BRK1-(Name)
SETTING
BREAKER 1 PUSHBUTTON
CONTROL
= Enabled
USER 2 OFF/ON
To open BRK1-(Name)
SETTING
5
BREAKER 1 CLOSE
Off = 0
61850 Select & Close
C60, D60, L60, and L90 relays from recloser
FLEXLOGIC OPERAND
AR CLOSE BKR 1
SETTING
BREAKER 1 BLOCK CLOSE
Off = 0
IEC 61850 functionality is permitted when the L30 is in "Programmed" mode and not in the local control mode.
NOTE
5-68
OR
AND
AND
OR
SETTING
MANUAL CLOSE RECAL1 TIME
OR
Figure 5–16: DUAL BREAKER CONTROL SCHEME LOGIC (Sheet 1 of 2)
L30 Line Current Differential System
AND
AND
AND
AND
AND
OR
AND
AND
0
AND
5 SETTINGS
FLEXLOGIC OPERANDS
BREAKER 1 OFF CMD
BREAKER 1 TRIP A
BREAKER 1 TRIP B
BREAKER 1 TRIP C
To breaker control
logic sheet 2,
BKR ENABLED
842025A1
FLEXLOGIC OPERAND
BREAKER 1 MNL CLS
FLEXLOGIC OPERAND
BREAKER 1 ON CMD
827061AS.CDR