Power System - GE L30 Instruction Manual

Line current differential system, ur series
Hide thumbs Also See for L30:
Table of Contents

Advertisement

5 SETTINGS
b) VOLTAGE BANKS
PATH: SETTINGS
SYSTEM SETUP
VOLTAGE BANK F5
MESSAGE
MESSAGE
MESSAGE
MESSAGE
MESSAGE
bank of phase/auxiliary VTs can be set, where voltage banks are denoted in the following format (X represents the module
slot position letter):
Xa, where X = {F, L} and a = {5}.
See the Introduction to AC sources section at the beginning of this chapter for additional details.
With VTs installed, the relay can perform voltage measurements as well as power calculations. Enter the
made to the system as "Wye" or "Delta". An open-delta source VT connection would be entered as "Delta".
NECTION
The nominal
PHASE VT F5 SECONDARY
voltage is applied to the VT primary.
NOTE
For example, on a system with a 13.8 kV nominal primary voltage and with a 14400:120 volt VT in a delta connec-
tion, the secondary voltage would be 115; that is, (13800 / 14400) × 120. For a wye connection, the voltage value
entered must be the phase to neutral voltage which would be 115 /
On a 14.4 kV system with a delta connection and a VT primary to secondary turns ratio of 14400:120, the voltage
value entered would be 120; that is, 14400 / 120.
PATH: SETTINGS
SYSTEM SETUP

POWER SYSTEM

MESSAGE
MESSAGE
MESSAGE
The power system
NOMINAL FREQUENCY
cannot be measured from available signals. This may happen if the signals are not present or are heavily distorted. Before
reverting to the nominal frequency, the frequency tracking algorithm holds the last valid frequency measurement for a safe
period of time while waiting for the signals to reappear or for the distortions to decay.
The phase sequence of the power system is required to properly calculate sequence components and power parameters.
The
setting matches the power system phase sequence. Note that this setting informs the relay of the
PHASE ROTATION
actual system phase sequence, either ABC or ACB. CT and VT inputs on the relay, labeled as A, B, and C, must be con-
nected to system phases A, B, and C for correct operation.
GE Multilin
AC INPUTS
VOLTAGE BANK F5(L5)
PHASE VT F5
CONNECTION: Wye
PHASE VT F5
SECONDARY: 66.4 V
PHASE VT F5
RATIO: 1.00 :1
AUXILIARY VT F5
CONNECTION: Vag
AUXILIARY VT F5
SECONDARY: 66.4 V
AUXILIARY VT F5
RATIO: 1.00 :1
voltage setting is the voltage across the relay input terminals when nominal
POWER SYSTEM
NOMINAL FREQUENCY:
60 Hz
PHASE ROTATION:
ABC
FREQUENCY AND PHASE
REFERENCE: SRC 1
FREQUENCY TRACKING:
Enabled
value is used as a default to set the digital sampling rate if the system frequency
L30 Line Current Differential System
5.4 SYSTEM SETUP
Range: Wye, Delta
Range: 25.0 to 240.0 V in steps of 0.1
Range: 1.00 to 24000.00 in steps of 0.01
Range: Vn, Vag, Vbg, Vcg, Vab, Vbc, Vca
Range: 25.0 to 240.0 V in steps of 0.1
Range: 1.00 to 24000.00 in steps of 0.01
3
= 66.4.
5.4.2 POWER SYSTEM
Range: 25 to 60 Hz in steps of 1
Range: ABC, ACB
Range: SRC 1, SRC 2
Range: Disabled, Enabled
PHASE VT F5 CON-
5
5-57

Advertisement

Table of Contents
loading

Table of Contents