Gauge Panel Installation; Ignition Switch Removal And Installation; Ignition Switch Removal - Terex PT100 Forestry Service & Repair Manual

Compact track loaders
Hide thumbs Also See for PT100 Forestry:
Table of Contents

Advertisement

Compact Track Loader
5. Operator Enclosure Disassembly and Assembly
Figure 5-2
2. Carefully lower the gauge panel with the wire
harness attached.
Figure 5-3
3. View of gauge panel interior components. Inte-
rior components are now accessible for servic-
ing.
Figure 5-4
4. View of dome light. If removal is required, simply
insert a lever (blade-type screw driver) at oppo-
site end of switch in pry-pocket, and gently pry
the light assembly out of the gauge panel.

Gauge Panel Installation

Figure 5-5
1. Carefully position the gauge panel, without
pinching the wiring harness against the cab.
Figure 5-6
2. Secure the gauge panel to the cab with the four
screws.
Ignition Switch Removal and
Installation
The tools required for ignition switch removal and
installation are listed in Table 5-2. Use manufactur-
er-recommended tools whenever possible.
Table 5-2
Required Tools
Combination Wrench

Ignition Switch Removal

1. Lower the gauge panel. Refer to Chapter 5.
Gauge Panel Removal procedure.
5-2

Advertisement

Table of Contents
loading

Table of Contents