Ups System Power Wiring Preparations - Eaton 93PS-8(20)-20(-C) User And Installation Manual

93ps 8–40 kw
Table of Contents

Advertisement

Eaton 93PS UPS 8–40 kW
10 kW
15 kW
20 kW
30 kW
40 kW
Battery locations and enclosures must be ventilated to maintain the hydrogen
concentration below the 4%
provided to locations where the UPS and batteries are located. For the 93PS
UPS 8–20kW with internal batteries, the minimum air flow is 3 m
minimum free area of opening for inlet and outlet is 84 cm
ventilation is used. For the 93PS UPS 40 kW, the minimum air flow is 6 m
and the minimum free area of opening for inlet and outlet is 168 cm
natural ventilation is used. For larger batteries, the ventilation air flow must be
recalculated.
For the dimensions of the 93PS UPS cabinets, see Figure
Figure 9. The dimensions of the Eaton 93PS UPS 20 kW C-model frame, the 93PS UPS
20 kW frame, and the 93PS UPS 40 kW frame, respectively.
4.3.2
Note: If you are installing a maintenance bypass, provide one of the following:
- a minimum of 2 separate feeds with upstream feeder breakers
- a single feed with 2 upstream feeder breakers: one for the UPS or rectifier
input breaker and one for the maintenance bypass input.
Do not use a single feed or a single feeder breaker to supply
©
Eaton Corporation plc 2016. All rights reserved.
vol

UPS system power wiring preparations

Heat rejection
(BTU/h x 1,000)
1.46
2.19
2.92
4.38
5.84
safety limit. Adequate air ventilation must be
Revision: 003
Document ID: P-164000493
User's and installation guide
Heat rejection
(kW)
0.4
0.6
0.9
1.3
1.7
3
/hour and the
2
when natural
3
/hour
2
when
9
.
38 (104)