Eaton 93PS UPS 8–40 kW
operating environment must meet the height, clearance, and environmental
requirements specified.
4.3.1
The UPS system installation requires a TN, TT or IT power distribution system
(the IT distribution system shall include a neutral wire).
The UPS system installation must meet the following guidelines:
•
The system must be installed on a level floor suitable for computer or
electronic equipment. The floor must be suitable for heavy weight and
wheeling.
•
The system must be installed in a temperature and humidity controlled
indoor area that is free of conductive contaminants.
•
The cabinet can be installed in line-up-and-match or standalone
configurations.
Failure to follow these guidelines may void your warranty.
Do not stack anything on top of the 93PS UPS cabinet.
Do not stack the UPS 93PS C-model cabinet on top of any other similar
cabinet(s).
If installed on a shelf, use suitable supports to prevent the UPS from tipping
or dropping.
The UPS equipment operating environment must meet the weight requirements
shown in Table
Table 4: Dimensions
Shipping dimen-
sions (WxDxH)
Cabinet dimensions
(WxDxH)
Table 5: UPS cabinet weights with cardboard packaging
Shipping weight
Installed weight
©
Eaton Corporation plc 2016. All rights reserved.
Environmental and installation considerations
5
, and the size requirements shown in Table
20 kW frame
[mm]
540 x 857 x 1,460
335 x 750 x 1,300
20 kW
frame
293 kg
280 kg
CAUTION
20 kW frame
C-model
[mm]
540 x 857 x 705
335 x 750 x 645
20 kW C-model
frame
98 kg
86 kg
Revision: 003
Document ID: P-164000493
User's and installation guide
4
.
40 kW frame
[mm]
750 x 820 x 1,975
480 x 750 x 1,750
40 kW
frame
558 kg
532 kg
35 (104)