Figure 4-5. Isbm Section To Upm Section Joining Brackets - Eaton PowerXpert 9395P-600/600 Installation And Operation Manual

Powerxpert 9395 high performance (9395p-600) ups
Hide thumbs Also See for PowerXpert 9395P-600/600:
Table of Contents

Advertisement

Screw from Kit
Bracket from Kit
ISBM
Section Top
Top View Front Bracket
Eaton Power Xpert 9395P-600 (380V-600V) UPS Installation and Operation Manual
10. Reinstall the left top panel (see Figure 4‐3) and secure using the retained
hardware.
NOTE Three flat cabinet joining brackets are provided in the hardware kit for securing the ISBM and UPM
sections at the top front, top rear, and front base (see Steps 11 and 12).
11. Locate the hardware kit (packed inside a drawstring bag tied to the left middle
panel of the UPM section). Locate two flat brackets and screws from the
hardware kit. Align the holes in the flat brackets over holes in the top rear and
top front of the ISBM and UPM sections. Secure the brackets with the screws
from the hardware kit (see Figure 4‐5).
12. Locate one flat bracket and screws from the hardware kit. Align the holes in the
flat bracket over holes in the front base of the ISBM and UPM sections. Secure
the bracket with the screws from the hardware kit (see Figure 4‐5).
13. Proceed to paragraph 4.4.
Screw from Kit
Section Top
Front
Bracket from Kit
ISBM Section Base
Screw from Kit
Figure 4‐5. ISBM Section to UPM Section Joining Brackets
Screw from Kit
UPM
Bracket from Kit
ISBM
Section Top
Front View Base Bracket
Screw from Kit
S
P-164000710 Rev 1
UPS SYSTEM INSTALLATION
Screw from Kit
Back
Top View Rear Bracket
UPM Section Base
www.eaton.com/powerquality
UPM
Section Top
4-7