Installing An Optional Remote Monitor Panel Ii - Eaton PowerXpert 9395P-600/600 Installation And Operation Manual

Powerxpert 9395 high performance (9395p-600) ups
Hide thumbs Also See for PowerXpert 9395P-600/600:
Table of Contents

Advertisement

5.3

Installing an Optional Remote Monitor Panel II

Eaton Power Xpert 9395P-600 (380V-600V) UPS Installation and Operation Manual
To install RMP II wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7, "UPS Operating Instructions," for shutdown instructions.
2.
Perform the procedure listed in paragraph 5.1.
NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the wall. Do not
use hollow wall anchors.
3.
Securely mount the RMP II at the desired location. See Figure 5‐12 for mounting
hole locations.
NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installed between the
device and the UPS cabinet.
4.
Remove the ISBM cabinet top right interface conduit landing plate to drill or
punch conduit holes (see Figure 4‐12).
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RMP II. See Figure 5‐12 for RMP II
knockout hole location.
7.
Install wiring between the UPS and RMP II. See Figure 5‐2 and Table 5‐1 for the
Hot Sync CAN Bridge Card terminal location and wiring information, and
Figure 5‐7, Figure 5‐8, and Table 5‐5 for the RMP II terminal location and wiring
information.
NOTE 120 Vac for the RMP II should be supplied from the critical bus by facility planners or the customer.
8.
Install 120 Vac power wiring from the critical bus to the RMP II. See Figure 5‐7,
Figure 5‐8, and Table 5‐5 for the terminal location and wiring information.
9.
Close the front door and secure the latch.
10. Restart the UPS. See Chapter 7, "UPS Operating Instructions," for startup
instructions.
INSTALLING OPTIONS AND ACCESSORIES
S
www.eaton.com/powerquality
P-164000710 Rev 1
5-9

Advertisement

Table of Contents
loading

Table of Contents