Ericsson RBS 2106 Reference Manual page 275

Hide thumbs Also See for RBS 2106:
Table of Contents

Advertisement

Description
By means of the POWER INFORMATION element, the transmission
power of the RBS and the MS is immediately changed. It is an optional
part of the DATA REQUEST message on Abis. /GSM 08.58:8.3.1/ The
power information element contains the new power levels to be used by
the RBS (BS Power Level) and the MS (MS Power Level) on the air
interface.
The RBS will immediately, without waiting for the next measurement
period, change output power to BS Power Level. The MS Power Level
will be sent to the MS in the L1 header on SACCH as soon as possible.
If the RBS receives a value that would result in a setting below the
lowest allowed level, the power is set to the lowest allowed level.
The function is terminated when Power Information has been
acknowledged according to the LAPDm protocol.
EN/LZT 720 0008
P2A
2001-11-28
© Ericsson Radio Systems AB
— All Rights Reserved —
Call Control
273 (485)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rbs 2206

Table of Contents