Ericsson RBS 2106 Reference Manual page 222

Hide thumbs Also See for RBS 2106:
Table of Contents

Advertisement

Unit Description, RBS 2106 Climate Unit
Indicators, Buttons and Test Connector
Figure 120
On the CCU front panel there are nine indicators (see the following
table), a test button and a test and general signal connector.
Table 144
Indicator
CCU Fault
Operation
Heater fault
Heat exchanger internal fan fault
Heat exchanger external fan fault
Power fault
EPC-bus fault
Active cooler fan fault
Active cooler fault
220 (485)
View of Backplane
CCU
Indicators
© Ericsson Radio Systems AB
— All Rights Reserved —
Colour
Red
Green
Yellow
Yellow
Yellow
Yellow
Yellow
Yellow
Yellow
EN/LZT 720 0008
P008423A
P2A
2001-11-28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rbs 2206

Table of Contents