NEC NovaScale R480 E1 User Manual page 299

Table of Contents

Advertisement

5.
Remove the rails from both sides of the dummy tray, and attach them to the tape device.
6.
Connect the power cable of the server, and connect the SCSI/USB cable coming with the device.
7.
Insert the tape device into the server chassis until it is locked.
NOTE:
Some devices may protrude from the chassis by several millimeters.
8.
Route the signal cable.
9.
Install the top cover.
Removal
Remove the 5-inch device in the reverse procedure of the installation.
9-15

Advertisement

Table of Contents
loading

Table of Contents