5.
Remove the rails from both sides of the dummy tray, and attach them to the tape device.
6.
Connect the power cable of the server, and connect the SCSI/USB cable coming with the device.
7.
Insert the tape device into the server chassis until it is locked.
NOTE:
Some devices may protrude from the chassis by several millimeters.
8.
Route the signal cable.
9.
Install the top cover.
Removal
Remove the 5-inch device in the reverse procedure of the installation.
9-15