Installation
March 2017
3.3.1
Installation plan
It's a good idea to make a plan of the installation in order to ensure that all components in the system are
properly specified. The plan should include the following:
suitable locations for devices
power budget
cabling and connections (for example whether devices will be "daisy-chained" or not)
specification of cable glands for the various devices
location of terminators on the Tankbus (Rosemount 2410 Tank Hub)
identification codes such as Unit ID/Device ID of each device
assigned communication addresses for level gauges and other field devices to be stored in the Tank
Databases
See
"Electrical installation" on page 28
1.
See the Rosemount Tank Gauging System Configuration manual (Document no. 00809-0300-5100) and the Rosemount 2410 Tank Hub Reference Man-
ual (Document no. 00809-0100-2410) for more information.
24
(1)
of the Rosemount 2460 System Hub and Rosemount 2410 Tank Hub
for more information on cables and glands.
Reference Manual
00809-0100-2460, Rev DB
Installation