Installation - Emerson Rosemount 2120 Quick Start Manual

Level switch vibrating fork
Hide thumbs Also See for Rosemount 2120:

Advertisement

March 2022
2

Installation

2.1
Fork alignment in a pipe installation
The fork is correctly aligned by positioning the groove or notch as indicated
(Figure
2-1).
Figure 2-1: Correct Fork Alignment for Pipe Installation
A
B
OK
OK
A. Tri Clamp process connections have a circular notch
B. Threaded process connections have a groove
2.2
Fork alignment in a vessel (tank) installation
The fork is correctly aligned by positioning the groove or notch as indicated
(Figure
2-2).
Figure 2-2: Correct Fork Alignment for Vessel (Tank) Installation
A
B
C
A. Tri Clamp process connections have a circular notch
B. Threaded process connections have a groove
C. Flanged process connections have a circular notch
Quick Start Guide
A
B
OK
OK
OK
Quick Start Guide
5