Scheduled Maintenance Procedures; September - Genie AWP Super Series Service Manual

Hide thumbs Also See for AWP Super Series:
Table of Contents

Advertisement

September 2016

Section 3
Schedul ed Mai ntenance Pr ocedures
Intr oducti on
Observe and Obey:
Maintenance inspections shall be completed
by a person trained and qualified on the
maintenance of this machine.
Scheduled maintenance inspections shall be
completed daily, quarterly, and annually as
specified on the Maintenance inspection
Report. The frequency and extent of periodic
examinations and tests may also depend on
national regulations.
Failure to perform each
procedure as presented and
scheduled may cause death,
serious injury or substantial
damage.
Immediately tag and remove from service a
damaged or malfunctioning machine.
Repair any machine damage or malfunction
before operating the machine.
Use only Genie approved replacement parts.
Machines that have been out of service for a
period longer than 3 months must complete the
quarterly inspection.
Part No. 38139

Scheduled Maintenance Procedures

Machine Configuration:
AWP Super Series • IWP Super Series
Unless otherwise specified, perform each
procedure with the machine in the following
configuration:
• Machine parked on a firm, level surface
• Key switch in the off position with the key
removed
• The red Emergency Stop button in the off
position at both the ground and platform
controls
• Wheels chocked
• All external AC power supply disconnected
from the machine
• Platform in the stowed position
Service Manual
27