Inspect For Proper Outrigger Length - Awps Models - Genie AWP Super Series Service Manual

Hide thumbs Also See for AWP Super Series:
Table of Contents

Advertisement

September 2016
3
Compress the spring to 15/16 in / 2.4 cm by
turning the nylock nut clockwise to increase
the spring compression or counterclockwise to
decrease the spring compression.
Component damage hazard. Do
not exceed the recommended
spring compression.
4
Confirm the spring measurement on each
sequencing cable.
5
Raise and lower the platform through three
complete cycles and confirm the spring
compression.
6
Repeat adjustment for each cable as required.
Part No. 38139
B-9 Ins pect for Proper Outri gger Length - AW PS Model s
B-9
Inspect for Proper Outrigger
Length - AWPS Models
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper outrigger length is essential to safe machine
operation. Operating a machine with outriggers
different from those originally designed for the
model will result in death or serious injury.
1
AWP Super Series • IWP Super Series
Checklist B Procedures
Measure each outrigger and verify for proper
length.
Service Manual
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iwp super series

Table of Contents