Post-Repair Procedures and Operational Performance Verification
Post Repair Procedures
Manual Performance Tests
To ensure the signal generator is meeting all published specifications,
4-2
to be performed after a specific assembly has been repaired or replaced.
Table 4-2
Manual Operational Performance Verification Tests
Manual Operational Performance Verification Tests
The following performance verification tests are listed
in the order that they should be performed.
page 246
a
Phase Noise
(N5181B/82B/83B only)
a. The Phase Noise test procedure is available as part of the N7822A EXG/MXG Series software.
242
lists the recommended manual operational performance verification tests