Chapter 6: After installation

After installation

After initial configuration, it is necessary to test the installation, and remove the installation
equipment.
Related links

Roadmap for post installation

Installation testing

on page 63
Removing the installation equipment
Roadmap for post installation
Perform these post-installation procedures tin the following order using the appropriate procedure
described in this section:
1. Test the installation
2. Remove the installation equipment
Related links
After installation
on page 63
Installation testing
When the installation is complete, you must perform simple tests to verify telephone and data
connectivity.
Related links
After installation
on page 63
Testing data connectivity
Testing telephones
Testing trunks
on page 64
Testing LSP failover
February 2017
on page 63
on page 66
on page 64
on page 64
on page 64