Site Requirements - Avaya G430 Installation And Upgrades

Branch
Hide thumbs Also See for G430:
Table of Contents

Advertisement

Before you install
temperature should be in the range 32 to 104˚F (0 to 40˚C). The humidity should not be higher than
90%.
Related links
Before you install
on page 10
Verifying temperatures and clearances
Verifying power outlets
Verifying the grounds
Verifying temperatures and clearances
About this task
Verify that temperatures and clearances are within the recommended technical parameters. Consult
the table of Technical Specifications in
Warning:
Verify that temperature and clearance ranges are within tolerable limits. The thermal sensors
may shut down equipment if it is subjected to conditions beyond the recommended limits.
Equipment can be damaged if these restrictions are not respected.
Related links

Site requirements

on page 15
Verifying power outlets
About this task
Check that an adequate number of power outlets are available. Verify that the Branch Gateway and
the other equipment in the rack do not present a possible overcurrent or overload to the customer's
branch circuit and/or power distribution strip. Power requirements are listed in
specifications
on page 129.
Warning:
Do not overload the power circuit.
Related links
Site requirements
on page 15
Verifying the grounds
About this task
Ensure that the installation site has access to approved grounds and that either a trained technician
or a licensed electrician will be verifying all grounds and installing the Supplementary Ground
Conductor (consult
Warning:
Installation in a Restricted Access Location and secure access are required in Finland, Norway,
and Sweden. The Branch Gateway relies on two ground connections: first, the mains plugs for
the power supplies are required to be connected to AC outlets that have earth contacts; and
second, the Supplementary Ground Conductor provided with the system provides a non-
February 2017
on page 16
on page 16
on page 16
Technical specifications
Attaching ground conductors
Installation and Upgrades for the Avaya Branch Gateway G430
Comments on this document? infodev@avaya.com
on page 128.
on page 33).
Power cord
16

Advertisement

Table of Contents
loading

Table of Contents