Removing And Replacing Tier 2 Customer Replaceable Units (Crus) - IBM BladeCenter HS22V 7871 Problem Determination And Service Manual

Hide thumbs Also See for BladeCenter HS22V 7871:
Table of Contents

Advertisement

10. If you removed an optional expansion unit, reinstall it (see "Installing an
11. Install the cover onto the blade server (see "Closing the blade server cover" on
12. Install the blade server into the BladeCenter unit (see "Installing the blade

Removing and replacing Tier 2 customer replaceable units (CRUs)

Use this information for removing and replacing Tier 2 CRUs.
You may install a Tier 2 CRU yourself or request IBM to install it, at no additional
charge, under the type of warranty service that is designated for your server.
82
BladeCenter HS22V Type 7871 and 1949: Problem Determination and Service Guide
Note: For device-driver and configuration information to complete the
installation of the expansion card, see the documentation that comes with the
storage interface card.
7. Install the backup battery for the storage interface card into DIMM connector
ten (see "Blade server connectors" on page 14 and "Installing a memory
module" on page 64).
DIMM 10
connector
8. Install the backup-battery cable to the backup battery. The side of the cable
with the blue touchpoint should be oriented towards the center of the blade
server.
9. Orient the backup-battery cable so that it lays flat over the top of the heat sink
for microprocessor two.
optional expansion unit" on page 58).
page 56).
server in a BladeCenter unit" on page 53).
Cable "B"
Battery
Cable "B"
Battery

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladecenter hs22v 1949

Table of Contents