Hardware Maintenance; Tool Preparation; Parts Replacement - Inspur NF5180M4 User Manual

Table of Contents

Advertisement

5 Hardware Maintenance

5.1 Tool Preparation

Tools to be prepared before construction, as shown in the following table.
Tool List

5.2 Parts Replacement

Special tips: Except hot plugging parts (i.e. hot plugging hard disk etc.), all part
replacements could only be carried out with power disconnected.
5.2.1 Processor Replacement
During installing and replacing CPU, please pay attention to the following issues:
During installing two CPUs, type of these two CPUs shall be the same.
When only one CPU is to be installed, please operate according to the following
requirements:
1)
This CPU has to be installed on CPU0's socket, and see [Mainboard Diagram] for
CPU position.
2)
It is not allowed to dismantle the protective cover on sockets without CPU1 installed.
Illustration
Name
Phillips
Used to fix bolts.
Screwdriver
Used to contact or
Anti-static Wrist
operate devices and
Strap
apparatuses, to prevent
static electricity.
Used to plug in single
board, hand-held single
board or other precision
Anti-static Gloves
instruments etc., to
prevent static electricity.
Hardware Maintenance
Description
 73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents