Commissioning: Trip Circuit Monitoring for Breakers
Object to Be Tested:
Test of the trip circuit monitoring (with 52a and 52b contact).
Procedure, Part 1:
Simulate failure of the control voltage in the power circuits.
Successful Test Result, Part 1:
After expiration of »t-TCM« the trip circuit supervision, TCM of the device should signal an alarm.
Procedure, Part 2:
Simulate a broken cable in the breaker control circuit.
Successful Test Result, Part 2:
After expiration of »t-TCM«, the trip circuit supervision TCM of the device should signal an alarm.
For breakers that trip by means of little energy (e.g.: via an optocoupler), it has
to be ensured that the current applied by the digital inputs will not cause false
tripping of the breaker.