JLG G5-18A Operation Manual page 97

Hide thumbs Also See for G5-18A:
Table of Contents

Advertisement

This installation procedure is designed for one-person operation. Prior to exiting cab,
perform "Shut-Down Procedure" on page 4-4.
1. Tilt quick attach forward to provide clearance.
Check to be sure lock pin handles and pins are
pulled up.
2. Align engaging edge with recess in attachment.
Raise boom slightly to engage edge in recess.
3. Tilt quick attach back to engage attachment.
4. Lower lock pin handles to engage lock pins.
5. If attachment is equipped, connect auxiliary hydraulic hoses. See "Hydraulic Operated
Attachment" on page 5-14.
31200743
Section 5 - Attachments and Hitches
OAL1880
OAL1890
OAL1900
OAL1910
5-13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2505h

Table of Contents