JLG G5-18A Operation Manual page 94

Hide thumbs Also See for G5-18A:
Table of Contents

Advertisement

Section 5 - Attachments and Hitches
Mechanical Quick Attach
This installation procedure is designed for one-person operation. Prior to exiting cab,
perform "Shut-Down Procedure" on page 4-4.
1. Tilt quick attach forward to provide clearance.
Check to be sure lock pin and retainer pin are out.
2. Align attachment pin with recess in attachment.
Raise boom slightly to engage attachment pin in
recess.
3. Tilt quick attach back to engage attachment.
4. Insert lock pin and secure with retainer pin.
5. If attachment is equipped, connect auxiliary hydraulic hoses. See "Hydraulic Operated
Attachment" on page 5-14.
5-10
OAL1820
OAL1830
OAL1840
OAL1850
31200743

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2505h

Table of Contents