Motorola P-7131N-FGR Product Reference Manual page 62

This guide provides configuration and setup in formation for the ap-7131n-fgr model access point.
Table of Contents

Advertisement

2-16
Motorola Solutions AP-7131N-FGR Access Point Product Reference Guide
NOTE The AP-7131N-FGR is Plenum rated to UL2043 and NEC1999 to support
CAUTION Motorola Solutions does not recommend mounting the access point
The mounting hardware required to install the access point above a ceiling consists of:
• Light pipe
• Badge for light pipe
• Decal for badge
• Safety wire (strongly recommended)
• Security cable (optional)
To install the access point above a ceiling:
1. If possible, remove the adjacent ceiling tile from its frame and place it aside.
2. Install a safety wire, between 1.5mm (.06in.) and 2.5mm (.10in.) in diameter, in the ceiling
space.
3. If required, install and attach a security cable to the access point's lock port.
4. Mark a point on the finished side of the tile where the light pipe is to be located.
5. Create a light pipe path hole in the target position on the ceiling tile.
6. Use a drill to make a hole in the tile the approximate size of the LED light pipe.
CAUTION Motorola Solutions recommends care be taken not to damage the
7. Remove the light pipe's rubber stopper before installing the light pipe.
above the ceiling installations.
directly to any suspended ceiling tile with a thickness less than
12.7mm (0.5in.) or a suspended ceiling tile with an unsupported span
greater than 660mm (26in.). Motorola Solutions strongly recommends
fitting the access point with a safety wire suitable for supporting the
weight of the device. The safety wire should be a standard ceiling
suspension cable or equivalent steel wire between 1.59mm (.062in.)
and 2.5mm (.10in.) in diameter.
finished surface of the ceiling tile when creating the light pipe hole
and installing the light pipe.

Advertisement

Table of Contents
loading

Table of Contents