Suspended Ceiling T-Bar Installations - Motorola P-7131N-FGR Product Reference Manual

This guide provides configuration and setup in formation for the ap-7131n-fgr model access point.
Table of Contents

Advertisement

10. Cable the access point using either the Power Injector solution or an approved line cord and
power supply.
For Power Injector installations:
a. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the network data supply (host)
and the Power Injector Data In connector.
b. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the Power Injector Data &
Power Out connector and the access point's GE1/POE port.
c. Ensure the cable length from the Ethernet source to the Power Injector and access point
does not exceed 100 meters (333 ft). The Power Injector has no On/Off power switch.
The Power Injector receives power as soon as AC power is applied. For more information
on using the Power Injector, see
For standard 48-Volt Power Adapter (Part No. 50-14000-247R) and line cord installations:
a. Connect RJ-45 CAT5e (or CAT6) Ethernet cable between the network data supply (host)
and the access point's GE1/POE port.
b. Verify the power adapter is correctly rated according the country of operation.
c. Connect the power supply line cord to the power adapter.
d. Attach the power adapter cable into the power connector on the access point.
e. Plug the power adapter into an outlet.
11. Verify the behavior of the access point's LEDs. For more information, see
page
2-18.
The access point is ready to configure. For information on an access point default
configuration, see
configurations, see

2.7.2 Suspended Ceiling T-Bar Installations

A suspended ceiling mount requires holding the access point up against the T-bar of a suspended
ceiling grid, and twisting the chassis onto the T-bar.
The mounting tools (customer provided) and hardware required to install the access point on a ceiling
T-bar consists of:
• Safety wire (recommended and customer supplied)
• Security cable (and customer supplied)
Power Injector System on page
Getting Started on page
System Configuration on page
3-1. For specific details on system
4-1.
Hardware Installation
2-6.
LED Indicators on
2-13

Advertisement

Table of Contents
loading

Table of Contents