Configuration Tasks
Figure 17. Flow of configuration tasks for the SAN384B-2
The initial physical hardware installation continues with the steps:
v "Providing power to the SAN384B-2" on page 35
v "Connecting the SAN384B-2 and host with a serial cable" on page 35
v "Logging in to the serial console port" on page 36
v "Configuring the IP addresses" on page 36
v Installing optical transceivers and cables (see "Removing and installing
The additional steps are customer responsibilities required for the initial
configuration:
1. Establish an Ethernet connection. See "Establishing an Ethernet connection" on
2. Specify a switch name. See "Customizing the switch name" on page 38.
3. Specify a domain ID for the SAN384B-2. See "Setting the Domain ID" on page
4. Set the date and time. See "Setting the date and time" on page 39.
5. Connect to the fabric. See "Verifying the persistent PID feature" on page 41
34
SAN384B-2 Installation, Service, and User Guide
Connect Serial Cable
between Switch and Host
Log In to Serial Console Port
Set IP Address
Log off Serial Console Port
and Disconnect Serial Cable
Connect Ethernet Cable
and Open Telnet Session
Set Domain ID
Set Date and Time
Install SFPs and
Attach Cables
Manage Cables
Verify Operation and
Back Up Configuration
transceivers" on page 90 and "Managing cables" on page 44)
page 38.
39.