4. Remove the filler panel or port blade. Refer to "Removing a port or application
5. Follow the instructions for "Installing a blade" on page 72.
6. Follow the instructions for "Removing and installing transceivers" on page 90.
7. Install, group, and route the cables. See "Managing cables" on page 44 for
8. Verify the installation. For information about how to check the status of

FC3864 - Installing an 8-Gb 64-port port blade

This feature can be installed while the SAN384B-2 is operational.
Attention: Follow these precautions for all procedures in this section to avoid
damaging the port blades or chassis:
v Wear a grounded ESD strap when handling a port blade.
v Carefully remove the protective strip (if any) covering the blade connectors
v Do not force the port blade installation. If the port blade does not slide in easily,
v Hold the port blade by the edges of the metal pan. Do not use the ejectors to
v Disassembling any part of a port blade voids the part warranty and regulatory
These instructions cover installing a new FC3864 in the SAN384B-2 chassis.

Time required

20 minutes or more per port blade due to port and cable density

Items required

v ESD (electrostatic discharge) grounding strap
v Workstation computer
v Port blade
v #2 Phillips screwdriver
118
SAN384B-2 Installation, Service, and User Guide
Note: Firmware downloads require that Ethernet connections be made to both
CP blades. Procedures for downloading and installing firmware are
described in the Fabric OS Administrator's Guide.
blade" on page 70 or "Removing and installing blade filler panels" on page 72.
Attention: A filler panel should be removed only when being replaced with a
port blade or new filler panel. Any slot that is not occupied by a port blade
should be occupied by a filler panel to ensure correct cooling of the chassis and
protection from dust.
Because of port density, it may be easier to remove and install the SFP+
transceivers while the 32-port or 48-port blade is out of the chassis. However,
you must handle the blade carefully while it is out of the chassis to avoid
damaging the blade and the transceivers.
additional cabling instructions.
Attention: Do not route cables in front of the exhaust vent, which is located at
the top on the port side of the chassis.
hardware components using the CLI, see the Fabric OS Administrator's Guide,
which is located on the product documentation CD.
before installing any blades.
ensure that it is correctly aligned inside the rail guides before continuing.
Installing a port blade with incorrect alignment damages both the chassis and
the replacement part.
hold a port blade.
certifications. There are no user-serviceable parts inside the port blade.