Drive Carrier Configuration; Planning And Configuring Your Installation - IBM 1269-3S2 Installation, Service And User Manual

Dcs9900 storage expansion unit
Table of Contents

Advertisement

IBM System Storage DCS9900 1269-3S2 Storage Expansion Unit Installation, Service, and User Guide
3
Cam the module home by manually closing the latches
4
A click should be heard as the latch engages.
Figure 2–10

2.7 Drive Carrier Configuration

2.7.1 Planning and Configuring Your Installation

2.7.1.1
System Configuration
Important
Before you begin installation you should become familiar with the configuration requirements of
your IBM System Storage DCS9900 3S2 Storage Expansion Unit. Please refer to Section
information on your overall system configurations.
When planning your system configuration, please remember that all IBM System Storage DCS9900 3S2
Storage Expansion Unit drive bays must be filled with either a drive carrier or front dummy carrier module,
no bays should be left completely empty.
Warning
Operation of the Enclosure with ANY modules missing will disrupt the airflow and the drives will
not receive sufficient cooling. It is ESSENTIAL that all apertures are filled before operating the
unit. Dummy Carriers are available for this purpose.
22
Installing an EBOD Module
(Figure
2–10).
2.1
for

Advertisement

Table of Contents
loading

Table of Contents